Project
City Reservoir Lining
Potable-compatible tank lining and basement-grade waterproofing.
1 solution · 2 products
Overview
Project overview
Context for this Primadonn case study.
Location
Hyderabad
Year
2023
Potable-compatible tank lining and basement-grade waterproofing.
Challenge
The challenge
What the site team needed to solve.
Site pressure
The constraint that shaped the system
An aging municipal reservoir showed joint seepage and required a lining compatible with potable service after cure.
Solution
How we approached it
Systems applied on this project.
Surface repair, cementitious waterproofing, and Tank Guard lining were sequenced with flood testing before return to service.
Products used
Products on this project
Every product links to its detail page.
Aqua Shield Membrane
Flexible cementitious waterproofing for roofs and basements.
Coverage 1.5 kg/m²
View productProof
Before & after
Drag the handle to compare site condition before intervention and the finished result.
Gallery
Project gallery
Swipe or click to open.
Watch
Project videos
Site overviews and application highlights.
Outcome
Results
What changed after the Primadonn system was applied.
Measured result
After system application and handover
Reservoir passed commissioning flood tests; seepage paths closed ahead of peak summer demand.
“Flood-test confidence mattered most. The lining package held when we filled.”