Overview

Project overview

Context for this Primadonn case study.

Potable-compatible tank lining and basement-grade waterproofing.

Challenge

The challenge

What the site team needed to solve.

Site pressure

The constraint that shaped the system

An aging municipal reservoir showed joint seepage and required a lining compatible with potable service after cure.

Solution

How we approached it

Systems applied on this project.

Surface repair, cementitious waterproofing, and Tank Guard lining were sequenced with flood testing before return to service.

Products used

Products on this project

Every product links to its detail page.

Proof

Before & after

Drag the handle to compare site condition before intervention and the finished result.

Before and after comparison slider
City Reservoir Lining afterAfter
City Reservoir Lining beforeBefore

Watch

Project videos

Site overviews and application highlights.

Outcome

Results

What changed after the Primadonn system was applied.

Measured result

After system application and handover

Reservoir passed commissioning flood tests; seepage paths closed ahead of peak summer demand.

  • Flood-test confidence mattered most. The lining package held when we filled.