Harbor View Residences project

Project

Harbor View Residences

Full wet-area and terrace waterproofing package.

Chennai2024

2 solutions · 3 products

Overview

Project overview

Context for this Primadonn case study.

Full wet-area and terrace waterproofing package.

Challenge

The challenge

What the site team needed to solve.

Site pressure

The constraint that shaped the system

Multiple towers showed terrace ponding and bathroom seepage into lower floors after monsoon, with occupation deadlines already locked.

Solution

How we approached it

Systems applied on this project.

Primadonn delivered a terrace elastomeric and cementitious system plus wet-area coats before tiling, with junction detailing at parapets and pipe sleeves.

Products used

Products on this project

Every product links to its detail page.

Proof

Before & after

Drag the handle to compare site condition before intervention and the finished result.

Before and after comparison slider
Harbor View Residences afterAfter
Harbor View Residences beforeBefore

Watch

Project videos

Site overviews and application highlights.

Outcome

Results

What changed after the Primadonn system was applied.

Measured result

After system application and handover

Zero reported wet-area callbacks in the first monsoon after handover; terraces passed flood checks before screed.

  • The wet-area package was sequenced cleanly around our tiling crews — detailing at junctions made the difference.

    K. Ramesh

    Project Manager, Harbor View

Construction technical assistance

Project support

Plan a project like Harbor View Residences

Talk to our team about products, detailing, and site support.