River Crossing Bridge project

Project

River Crossing Bridge

Structural repair and expansion joint sealing.

Coimbatore2022

2 solutions · 2 products

Overview

Project overview

Context for this Primadonn case study.

Structural repair and expansion joint sealing.

Challenge

The challenge

What the site team needed to solve.

Site pressure

The constraint that shaped the system

Spalled cover concrete and leaking expansion joints threatened deck integrity under continuous traffic.

Solution

How we approached it

Systems applied on this project.

Section restoration with polymer-modified mortar and ±25% movement joint sealing were staged with night lane closures.

Products used

Products on this project

Every product links to its detail page.

Proof

Before & after

Drag the handle to compare site condition before intervention and the finished result.

Before and after comparison slider
River Crossing Bridge afterAfter
River Crossing Bridge beforeBefore

Watch

Project videos

Site overviews and application highlights.

Outcome

Results

What changed after the Primadonn system was applied.

Measured result

After system application and handover

Deck leaks closed and repaired members returned to service with protective detailing at joints.

  • Night closures were enough. The repair mortar and joint work have held through two monsoons.

    S. Devi

    Site Engineer, PWD

Construction technical assistance

Project support