Summit Logistics Hub project

Project

Summit Logistics Hub

Epoxy flooring for high-traffic warehouse aisles.

Pune2025

1 solution · 1 product

Overview

Project overview

Context for this Primadonn case study.

Epoxy flooring for high-traffic warehouse aisles.

Challenge

The challenge

What the site team needed to solve.

Site pressure

The constraint that shaped the system

Dusting concrete aisles and worn traffic lanes slowed forklift operations and raised housekeeping load.

Solution

How we approached it

Systems applied on this project.

Mechanical prep and a 2–3 mm epoxy system were applied in phased aisle shutdowns to keep outbound docks live.

Products used

Products on this project

Every product links to its detail page.

Proof

Before & after

Drag the handle to compare site condition before intervention and the finished result.

Before and after comparison slider
Summit Logistics Hub afterAfter
Summit Logistics Hub beforeBefore

Watch

Project videos

Site overviews and application highlights.

Outcome

Results

What changed after the Primadonn system was applied.

Measured result

After system application and handover

Seamless, easy-clean floors with measurable drop in dust complaints and faster aisle cleaning cycles.

  • Phased aisle work meant we never lost a full shift. The epoxy has held up under forklift traffic.

    Vikram Shah

    Operations Head, Summit Logistics

Construction technical assistance

Project support

Plan a project like Summit Logistics Hub

Talk to our team about products, detailing, and site support.