Project
Coastal Jetty Protection
Zinc-rich primer and protective coating for marine steel.
1 solution · 2 products
Overview
Project overview
Context for this Primadonn case study.
Location
Visakhapatnam
Year
2024
Zinc-rich primer and protective coating for marine steel.
Challenge
The challenge
What the site team needed to solve.
Site pressure
The constraint that shaped the system
Salt spray and chloride exposure were accelerating corrosion on jetty steel and adjacent concrete edges.
Solution
How we approached it
Systems applied on this project.
Blast cleaning, zinc-rich priming, and protective top systems were applied in tidal windows with marine access constraints.
Products used
Products on this project
Every product links to its detail page.
Proof
Before & after
Drag the handle to compare site condition before intervention and the finished result.
Gallery
Project gallery
Swipe or click to open.
Watch
Project videos
Site overviews and application highlights.
Outcome
Results
What changed after the Primadonn system was applied.
Measured result
After system application and handover
Corrosion progression slowed; planned recoat cycle extended versus the previous unprotected baseline.
“Working the tides is hard — the primer system and sequencing matched our access windows.”