Project
Northgate Offices
Facade coating and joint sealant retrofit.
1 solution · 2 products
Overview
Project overview
Context for this Primadonn case study.
Location
Bengaluru
Year
2023
Facade coating and joint sealant retrofit.
Challenge
The challenge
What the site team needed to solve.
Site pressure
The constraint that shaped the system
Weathered facade coatings and failed expansion joints allowed water staining and tenant complaints on a live office campus.
Solution
How we approached it
Systems applied on this project.
Anti-carbonation facade coats and polyurethane joint sealing were phased elevation-by-elevation to keep floors occupied.
Products used
Products on this project
Every product links to its detail page.
Proof
Before & after
Drag the handle to compare site condition before intervention and the finished result.
Gallery
Project gallery
Swipe or click to open.
Watch
Project videos
Site overviews and application highlights.
Outcome
Results
What changed after the Primadonn system was applied.
Measured result
After system application and handover
Facade staining halted; joint movement capacity restored without full campus shutdown.
“We needed a quiet retrofit. Primadonn’s sequencing kept tenants in place while we closed the envelope.”
More proof
Related projects
Similar industries or systems.
Coastal Jetty Protection
Visakhapatnam · 2024
Zinc-rich primer and protective coating for marine steel.
View case study